工程施工室外電纜溝施工方案(中英文).doc
《工程施工室外電纜溝施工方案(中英文).doc》由會(huì)員分享,可在線閱讀,更多相關(guān)《工程施工室外電纜溝施工方案(中英文).doc(11頁(yè)珍藏版)》請(qǐng)?jiān)趨R文網(wǎng)上搜索。
1、隨風(fēng)飄落電纜溝開挖施工方案Work Method of Cable Trench Excavation 編 制:Compiled by: 審 核:Reviewed by:2009年10月21日October 21, 2009名目Content一. 概況 OVERVIEW31.1 工程概況 PROJECT OVERVIEW31.2 施工范圍 SCOPE OF WORK3二編制依據(jù) COMPILATION BASIS4三施工工藝流程CONSTRUCTION PROCESS:4四. 前期預(yù)備PREPARATIONS44.1 技術(shù)預(yù)備TECHNICAL PREPARATION44.2 材料預(yù)備MATE
2、RIAL PREPARATION54.3 主要機(jī)具預(yù)備MAIN EQUIPMENTS PREPARATION54.4 作業(yè)環(huán)境預(yù)備OPERATING ENVIRONMENT PREPARATIONS5五. 電纜溝施工CABLE TRENCH CONSTRUCTION55.1 電纜溝測(cè)量、定位CABLE TRENCH MEASUREMENT AND POSITIONING55.2 電纜溝開挖CABLE TRENCH EXCAVATION6六. 質(zhì)量把握QUALITY CONTROL76.1 電纜溝外形尺寸允許偏差表ALLOWABLE DEVIATED EXTERNAL DIMENSIONS OF
3、 CABLE TRENCH TABLE76.2 應(yīng)留意的質(zhì)量問題QUALITY ISSUES8七. 成品愛護(hù)FINISHED PROTECTION8八. 施工記錄CONSTRUCTION OF RECORD8九. 平安生產(chǎn)、文明施工要求和措施SAFETY AND CIVILIZED CONSTRUCTION REQUESTS AND MEASURES9附廠區(qū)電纜溝圖: ATTACHED: CABLE TRENCH DRAWING9一. 概況 Overview1.1 工程概況 Project Overview項(xiàng)目名稱:本工程涉及三個(gè)變電站,分別是現(xiàn)有的220/35kV A472變電站、現(xiàn)有的35
4、/10kV B301S變電站以及新建的35/10kV C581變電站,工作內(nèi)容為三個(gè)變電站之間和從三個(gè)變電站接至MV用戶的電力電纜、把握電纜、接地電纜敷設(shè)所需電纜溝的開挖工程。The project involves three substations, namely the existing 220/35kV A472 substation, the existing 35/10kV B301S the 35/10kV C581 substation and a new substation.This is the power, control and grounding cable tre
5、nch excavation project among three substationsand for MV users connected to the three substations. 1.2 施工范圍 Scope of Work1) 由A472變電站引出3路35kV出線。其中:一路引至B301S建筑(35/10kV變電站)原1#主變,原1#主變電纜將抽出,與新增4#主變連接;另兩路引至35/10kV C581變電站1#主變和2#主變。回路接受FS-YJY-26/35kV-1*300mm2單芯電纜,直埋敷設(shè)。去C581的兩路35kV線路,敷設(shè)時(shí)沿不同路徑,以避開兩回線路同時(shí)受損。P
6、ull three 35V outgoings from A472 substation. Of which: The first outgoing is led to B301S Building (35/10kV substation) the original one # main transformer, pull the original one # main transformer cable out, and connect to the adding 4 # main transformer; the other two outgoings are led to 35/10kV
7、 C581 # 1 and substation 2 # main transformer. Use FS-YJY-26/35kV-1 * 300mm2 single-core cables for Loopand buriedpulling. Two 35kV lines to C581 are laid along different paths to avoid damage of the two loops.2) 由B301S變電站引出7路10kV出線。全部引至B399中心制冷站?;芈方邮?0kV截面為95mm2的三芯鎧裝電纜,由B301S南面現(xiàn)有的電纜井引出直埋至裝置。Pull 7
8、10kV outgoings from B301S substation to B399central refrigeration station. Loop uses 10kV three-core armored cable with cross-section 95mm2 and pullout from the existing cable well in the south of B301S then buried layto the device. 3) 由C581引出10路10kV線路,分別為A507的四臺(tái)變壓器,B551的兩臺(tái)變壓器,B553TDA裝置氫氣壓縮機(jī)2臺(tái),C521鹽
- 1.請(qǐng)仔細(xì)閱讀文檔,確保文檔完整性,對(duì)于不預(yù)覽、不比對(duì)內(nèi)容而直接下載帶來的問題本站不予受理。
- 2.下載的文檔,不會(huì)出現(xiàn)我們的網(wǎng)址水印。
- 3、該文檔所得收入(下載+內(nèi)容+預(yù)覽)歸上傳者、原創(chuàng)作者;如果您是本文檔原作者,請(qǐng)點(diǎn)此認(rèn)領(lǐng)!既往收益都?xì)w您。
下載文檔到電腦,查找使用更方便
16 積分
下載 | 加入VIP,下載共享資源 |
- 配套講稿:
如PPT文件的首頁(yè)顯示word圖標(biāo),表示該P(yáng)PT已包含配套word講稿。雙擊word圖標(biāo)可打開word文檔。
- 特殊限制:
部分文檔作品中含有的國(guó)旗、國(guó)徽等圖片,僅作為作品整體效果示例展示,禁止商用。設(shè)計(jì)者僅對(duì)作品中獨(dú)創(chuàng)性部分享有著作權(quán)。
- 關(guān) 鍵 詞:
- 工程施工 室外 電纜溝 施工 方案 中英文